History in the Making: Town Hall Renovation
2004 Renovation Work
Phase I Complete
The Phase I work is now done.
An open house to celebrate the completion of these
renovations is planned for September 20th, 2004.
Work will now continue to renovate and update the interior with electrical rewiring,
heating and AC, and re-opening the front Door.
Improvements include, a new basement under the original Town Hall,
fire sprinklers, a ramp, elevator, and bathrooms compliant with the
Americans with Disabilities ACt (ADA).
The new basement will be used for a
combination of storage, a new conference room and office space that allows for
future expansion.
The construction leaves the Town Hall still looking much as it did when it was built
in 1825.
Pictures of earlier renovation work can be found on the
2003 renovations page.
| |
|
|
|
The New Elevator Shaft, March 1, 2004
The New Elevator Shaft is frame covered to heat it
to allow for brick work.
|
 |
 |
The New Elevator Shaft, March 1, 2004
A peek at the new brick work.
|
|
The Final Brick Work is Complete March 2, 2004
Looks like it has always been here.
|
 |
 |
Inside the Stairway
April 2, 2004
A look at the new stairway.
|
|
Final brick work, Windows, and the Ramp
April 29, 2004
In the home stretch.
|

|
 |
Outside Windows and the Stone Ramp April 29, 2004
Another look at the new stairway and ramp.
|
Elevator & Stairway Movie
May 3, 2004
You will need the Quicktime
video player to view this movie.
Double click to start the movie.
Note that this movie is about 2 MB, so it may take a while to download it.
|
|
|
The Railing is installed
June 18, 2004
Its almost done.
|
 |
|
Renovations complete August, 2004
Outside views of the ramp and elevator shaft.
Join all at the ribbon cutting and open house on September 20, 2004.
|