History in the Making: Town Hall Renovation
We will include periodic updates here on the Town Hall Project.
Find out about the current progress and status here.
Planned improvements include, a new basement to be dug under the existing Town Hall,
fire sprinklers, and a ramp, elevator, and bathrooms compliant with the
Americans with Disabilities ACt (ADA).
The new basement will be used for a
combination of storage, a new conference room and office space that allows for
future expansion.
The construction will leave the Town Hall still looking much as it looked when it was built in 1825.
| | | |
 |
Breaking Ground for the Town Hall Renovation,
June 16, 2003 |
Fire Escape Removal, July 9, 2003
Turnstone Construction tore down the fire escape stairwell on the back of the Town Hall on
July 9, 2003. Two men and the help of the forklift were
all that were needed to take the fire escape down. |

|

 |
Excavation Begins, July 31, 2003
Beams and Jacks in Place, preparing to excavate the basement. |
Excavation is started August 1, 2003
|

|

 |
Let the Digging Begin!!! August 4, 2003
|
Concrete for the Elevator Shaft August 11, 2003
Let it Flow, Let it Flow, Let if Flow (the Concrete that is...) The forms are for the bottom
level of the new elevator shaft. |

|

 |
The New Basement October 21, 2003
|
Basement Movie August 11, 2003
You will need the Quicktime
video player to view this movie.
Double click to start the movie.
Note that this movie is about 1MB, so it may take a while to download it.
|
|

 |
The New ADA Ramp November 26, 2003
The Town Hall will now be accessible to everyone. |
Concrete to shore up the old fireplaces November 26, 2003
 |

|

 |
The New Elevator Shaft, December 12, 2003
The New Elevator Shaft is framed.
|
| |
|
|
|